Case Study
Phosphate Processing
Industry
Chemical
Customer
Phosphate processor
Background
Pump inlet and discharge flanges
Challenges faced
Using glass filled PTFE. The flange surfaces were being filled with epoxy when maintenance assessed the surfaces condition to be undesirable. Plant personnel wanted to do away with the use of epoxy on the flanges.
Operating Conditions
1. Media: 25% sulfuric acid and some hydrogen peroxide
2. Temperature: 40 °C
3. Pressure: 4 kg/cm2
4. Size: DN200 PN10 (8”-150#)”
Solution and Benefits
Through close collaboration with the customer, it was determined that the best solution would be the new GYLON EPIX® Style 3504. Installation of 8” ring gaskets was complete without special handling using the plant’s standard practices.